China shop Designation Variator with Worm Gearbox Professional

Item Description

JWB Sequence Pace Variator 
1. Functions:

 JWB-X  type

  • Sizes: ≥04
  • Power up to 1.5 kW or far more
  • Situations in RAL 5571 blue solid iron
  • Shafts: scenario hardened and tempered metal.
  • Inner parts: warmth-treated steel
  • Output velocity with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque price max 1002Nm
  • Silent, vibration-free of charge operating
  • Bidirectional rotation
  • Handle handwheel positionable on either aspect
  • Slipping velocity to max load at 5% 
  • Regulation sensibility: ,5 rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B type

  • Sizes:01,02,03 and 04
  • Power up to 1.5 kW or significantly less
  • Situations in die-solid aluminium alloy
  • Shafts: circumstance hardened and tempered metal.
  • Inside components: warmth-taken care of steel
  • Output pace with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque worth max 795 Nm
  • Silent, vibration-free of charge running
  • Bidirectional rotation
  • Control hand wheel positionable on possibly side
  • Slipping velocity to max load at 5%
  • Regulation sensibility: ,5 rpm
  • Painted with blue epoxy-polyester powder 

two. Specialized parameters

 

Type Output Torque Output Shaft Dia.   Output Pace Assortment 2rpm-950rpm
SWB01 2.6-1.6N.m φ11 Relevant Motor Electrical power .18kW-7.5kW
SWB02 258-1.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Possibilities With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Enter Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Enter Flange

About Us

ZheJiang SCZPT Push Co.,Ltd,the predecessor was a point out-owned military mould enterprise, was recognized in 1965. SCZPT specializes in the full power transmission remedy for high-conclude tools production industries based mostly on the goal of “Platform Item, Application Design and Expert Services”.
SCZPT have a sturdy specialized force with over 350 workers at current, like in excess of thirty engineering professionals, 30 high quality inspectors, masking an location of 80000 sq. meters and varieties of innovative processing equipment and screening equipments. We have a good foundation for the industry software improvement and service of high-finish velocity reducers & variators owning to the provincial engineering techCZPT analysis middle,the lab of gear pace reducers, and the base of modern day R&D.

Our Team

Quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Supply

Underneath is a checklist of our at present accessible industrial gearboxes. If you can not find what you are searching for, make sure you speak to the manufacturing facility for much more possibilities. At EP, we are continually establishing new merchandise and retrofitting aged ones to meet up with customer specifications.

China shop Designation Variator with Worm Gearbox     Professional